The SMI155 System is comprised of two pipeline laterals. The System's 10.3-mile main 16-inch trunk extends from a subsea valve assembly in SMI-155 to a subsea connection with Sea Robin's 24-inch pipeline in SMI-127. A 4.5-mile 6-inch side lateral connects the production platform in SMI-160 to the main 16-inch trunk in SMI-156.
The SMI141 System is 4.7-mile 8-inch pipeline that extends from a production platform in SMI-141 to a subsea connection with Sea Robin's 24-inch pipeline in SMI-127.
|