The HIA68 System is comprised of four pipeline laterals. The System's 21-mile main 12-inch trunk extends from HI-A68 to a subsea connection withTransco's 12-inch line in HI-206. In addition, a 9-mile 8-inch lateral connects HI-261, a 2-mile 6-inch lateral connects HI-233, and a 9-mile 8-inch connects HI-A71.
|