High Island A523 System

The HIA523 System is comprised of two pipeline laterals. The System's 7.7-mile main 8-inch trunk extends from the “A” production platform in HI-A23 to a subsea connection with HIOS's 30-inch line in HI-A340. In addition, a 2.5-mile 6-inch lateral connects the “B” production platform to the “A” platform.