The EC121 System is a 10.2-mile 8-inch pipeline that extends from a subsea valve assembly in EC-121 to a subsea connection with Texas Eastern’s 30-inch pipeline in West Cameron 250. A producer-owned 7-mile 6-inch pipeline extends from the terminus of the System in EC121 to a production platform in EC104.
|